We have compiled a list of manufacturers, distributors, product information, reference prices, and rankings for Notification Support.
ipros is IPROS GMS ・ IPROS One of the largest technical database sites in Japan that collects information on.

Notification Support - List of Manufacturers, Suppliers, Companies and Products | IPROS GMS

Notification Support Product List

1~5 item / All 5 items

Displayed results

Support for the notification of energy-saving measures for buildings

We will assist in the preparation of the energy-saving measures notification required for the construction, expansion, or renovation of specific buildings as stipulated by the Energy Conservation Act.

Under the Energy Conservation Act, when constructing or making certain renovations to specific buildings of 300 square meters or more, a notification regarding energy conservation measures must be submitted to the relevant administrative authority at least 21 days before the start of construction (there are penalties for not submitting the notification). Our company will handle the preparation of this notification, which is cumbersome and requires expertise (currently, we do not handle residential applications).

  • Contract measurement
  • Notification Support

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

New Chemical Substance Notification (CSCL)

Before manufacturing or importing more than 1 tonne a year of a new chemical substance. From checking exemptions to preparing and filing the notification.

Under Japan's Chemical Substances Control Law (CSCL), a new chemical substance must be notified before it is manufactured or imported. Manufacturing or importing without notification is punishable by imprisonment of up to one year or a fine of up to 500,000 yen (Article 58, item 1). A standard notification requires test results on degradability, bioaccumulation and toxicity, and the authorities decide within three months of acceptance. Because testing is costly and slow, it is important to first check whether a special procedure applies: small-quantity, low-volume, polymer of low concern (PLC), or intermediate. Our office is run by a former chemical-company researcher. We check whether your substance is new from its structure and use, compare the special procedures, prepare the notification from your test results, and draft replies to questions from the three ministries. We also check whether a notification under the Industrial Safety and Health Act is needed.

  • Legal
  • Safety Management
  • Product Development
  • Notification Support

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Notification for Consumption of Specified High-Pressure Gases

When using special gases such as monosilane, or hydrogen and liquid oxygen above set amounts. We handle the notification required on the user side.

Gas users may also need to file a notification. Seven special high-pressure gases such as monosilane, phosphine and arsine are covered regardless of quantity; compressed hydrogen and compressed natural gas from 300 cubic meters of storage capacity, liquid oxygen, liquid ammonia and LPG from 3,000 kg, and liquid chlorine from 1,000 kg. Consumption must be notified to the prefectural governor at least 20 days before it begins (High Pressure Gas Safety Act Article 24-2; Enforcement Order Article 7). In particular, switching from individual cylinders to bulk tanks or cylinder bundles can raise storage capacity above the threshold and trigger a notification. After notification, facilities must be maintained in line with technical standards. We determine from the gas type and storage capacity whether a notification is needed, and prepare and file the notification and attachments. We support plants in semiconductors, metalworking, food and other industries.

  • Legal
  • Safety Management
  • Manufacturing Facility
  • Notification Support

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Notification for Small Quantities of Hazardous Materials

Even below the designated quantity, one-fifth or more requires a notification. From calculating the multiple to checking the storage area and preparing the notification.

Even when the amount of hazardous materials is below the designated quantity, storing or handling one-fifth or more (but less than the full designated quantity) requires a notification under the municipal fire prevention ordinance (Fire Service Act Article 9-4). "Below the designated quantity" does not mean "no notification". When several materials are handled, their multiples are added together. Deadlines and structural standards for storage areas are set by municipal ordinances. In Osaka City, the notification must be filed with the competent fire station at least 7 days before storage or handling begins. Notifications are also required when materials or quantities change, or when storage ends. Our Class A Hazardous Materials Engineer picks out materials and quantities from your SDSs, calculates the multiple, checks whether the storage area meets the standards, and prepares and files the notification.

  • Legal
  • Safety Management
  • Manufacturing Facility
  • Notification Support

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Notification of Changes in Hazardous Materials Type and Quantity

When changing the type or quantity of hazardous materials at a permitted facility. From checking that no modification permit is needed to filing 10 days in advance.

At a permitted manufacturing, storage or handling facility, changing the type, quantity or multiple of the designated quantity of hazardous materials without changing location, structure or equipment requires a notification to the municipal authority at least 10 days before the change (Fire Service Act Article 11-4(1)). Switching raw materials, changing solvent grades and revising stored quantities are typical cases. Changing the material type changes the designated quantity, so the multiple may exceed the permitted range or different facility standards may apply. It is important to determine whether a notification is enough or a modification permit is needed. Our Class A Hazardous Materials Engineer checks the new material's type and properties from its SDS, recalculates the multiple, confirms that a notification suffices, and prepares and files it.

  • Legal
  • Safety Management
  • Manufacturing Facility
  • Notification Support

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration